Skip to content

PHOENIX CLOSURES | GREENCASTLE, INDIANA

Full Process Mechanical Design and Installation for a New Plastic Injection molding Facility Including:

  • Equipment Mezzanines
  • Material Handling Equipment, Silos and Lines
  • Cooling Towers, Chillers and Full Process Water Piping Systems and Controls to Support Facility
  • Compressed air Systems
  • Equipment Rigging
  • Full-Building HVAC System Including Cooling, Heating and Ventilation
  • 3D Design with Full MEP and Structural Steel Drawing Coordination