“The ARCO/Murray team handled our project amazingly! It had a crucial completion date and they exceeded every expectation.”
James DeFily
Mainfreight
Truck terminal developments require careful coordination of cross-dock buildings, trailer circulation, and heavy-duty yard infrastructure to support high-volume freight operations.
ARCO/Murray partners with transportation providers, freight carriers and logistics operators to deliver build-to-suit truck terminals, cross-dock facilities, and terminal expansions nationwide.
Through design-build, we align site planning, building design, and paving systems early, allowing facilities to move efficiently from concept to operational readiness.
Through design-build, ARCO/Murray integrates engineering and construction from the start, aligning design decisions with constructability, procurement timelines, and long-lead equipment strategies before drawings are complete.
For truck terminal developments, this approach allows dock configuration, trailer circulation, yard paving systems, and site infrastructure to be evaluated early in the process, which reduces rework, protects schedules, and ensures facilities are ready to support daily freight operations.
Single Point of Accountability
One contract and one integrated team from feasibility through turnover.
Upfront Budget Commitment
Cost alignment begins during design, not after construction documents.
Terminal Circulation Planning
Dock configuration and trailer flow are evaluated early to support efficient operations.
Heavy-Duty Yard Infrastructure
Paving systems and drainage are designed for constant truck traffic.
Operational Continuity
Construction strategies minimize disruption when expanding active terminals.
Connect with our team to align scope, budget, and schedule from day one.